All projectsOnshore · Package Design
Glycol Gas Dehydration Skid — Tender Support
Process SimulationConceptual EngineeringTender Support
Project Overview
Tender engineering for a skid-mounted TEG gas dehydration unit targeting a 7 lb/MMscfd sales gas water content specification, sized for 25 MMscfd at 60 bara operating pressure.
Technical Scope
- Capacity
- 25 MMscfd
- Operating pressure
- 60 bara
- Water spec
- 7 lb/MMscfd
- Tender window
- 4 weeks
- Client
- Confidential
Engineering Approach
A full process simulation, contactor and regeneration still column sizing, glycol circulation pump and heat exchanger design were completed within a four-week tender window, supporting a competitive technical submission.
The complete equipment datasheet package — contactor vessel, reboiler, glycol-glycol heat exchanger, and flash separator — was issued with a structured process design narrative giving the client a fully substantiated equipment basis for commercial bidding.
Have a similar scope? Tell us your project and we'll respond within one business day.
Discuss your projectProject Outcomes
- Sized skid and full datasheet pack turned around inside the four-week tender window
- Compliance against the 7 lb/MMscfd water spec confirmed by the client's engineering review
- Client went on to win the tender the package was built for
Services Delivered
Process SimulationConceptual EngineeringTender Support